See your future inventory.
Spot stockouts and test scenarios in a few clicks.
BL-1042
StockoutLyon · pc
Period balances
| Period | Opening | ReceiptsReceipts | ConsumptionDemand | Closing | Closing shortageShort | Period details |
|---|---|---|---|---|---|---|
| Apr 5, 2027Apr 5 | 180 | 0 | 45 | 135 | 0 | |
| Apr 6, 2027Apr 6 | 135 | 0 | 65 | 70 | 0 | |
| Apr 7, 2027Apr 7 | 70 | 0 | 65 | 5 | 0 | |
| Apr 8, 2027Apr 8 | 5 | 50 | 0 | 55 | 0 | |
| Apr 9, 2027Apr 9 | 55 | 0 | 45 | 10 | 0 | |
| Apr 10, 2027Apr 10 | 10 | 0 | 0 | 10 | 0 | |
| Apr 11, 2027Apr 11 | 10 | 0 | 0 | 10 | 0 | |
| Apr 12, 2027Apr 12 | 10 | 0 | 95 | -85 | 85 | |
| Apr 13, 2027Apr 13 | -85 | 0 | 85 | -170 | 170 | |
| Apr 14, 2027Apr 14 | -170 | 0 | 35 | -205 | 205 | |
| Apr 15, 2027Apr 15 | -205 | 250 | 0 | 45 | 0 | |
| Apr 16, 2027Apr 16 | 45 | 0 | 70 | -25 | 25 |
How it works
How do I calculate projected inventory from Excel or CSV?
Import Stock, Supply (expected receipts), Demand (firm orders or requirements) and Forecast sheets or files. Include SKU or part number, ISO date YYYY-MM-DD and quantity for each flow. Add site and unit when you have several locations or units. Stock and Demand are enough to start.
How do I read or simulate a stockout?
Pick a SKU using the Stockouts filter. The chart shows periods with uncovered requirements. Choose Simulate to move a receipt, change a demand line or add a hypothetical receipt. The chart and period balances compare the scenario with your baseline.
Are firm orders and forecast added together?
By default, firm orders consume forecast within the same period. Net demand is the larger of the two totals. Select addition in the calculation settings if the flows are independent.
Are my files sent to a server?
Your files, calculations, simulations and exports are processed in your browser. Original files stay on your device. Export your scenario before closing the page.
Calculation assumptions
- Periods
- Calendar dates with no time-zone conversion. ISO weeks run Monday through Sunday, and months are calendar months. The horizon starts at the stock snapshot or first flow and ends at the last flow, with partial periods at the edges. Undated stock without flows uses the earliest date in the data, or today.
- Availability
- Opening stock is available at the start of its date. Expected receipts are assumed available before demand on the same day. Each receipt is a planning assumption. First and peak shortages reflect the order of days within a period.
- Forecast
- In net mode, period demand is max(firm orders, forecast). Orders consume the earliest forecast first in the same period. The remaining forecast is consumed on its date. Use addition for independent flows.
- Stockouts and backlog
- Closing stock = opening stock + receipts − consumption. A negative balance is unmet demand, carried once in the next opening balance. Closing shortage is max(0, −closing stock). The peak is the worst shortage on any date, with no summation across periods.
- Safety and alerts
- Stock is flagged when it falls strictly below the safety level, including at opening. Receipts are flagged if the day begins with unmet demand. A stock change is flagged at the largest of 1 unit, half the absolute opening balance, and the safety level.
- Identifiers and quantities
- Each SKU, site and unit combination is independent. Empty fields form their own groups. There is no merging or conversion of units. Use a single opening stock row per group. Quantities are nonnegative, with up to six decimal places.